Product Details:
|
Product Name: | High Tensile Strength Fiber Hooked Concrete Loose Type Concrete Steel Fiber | Key Words: | Steel Wire Fiber |
---|---|---|---|
Logo: | Yusen | Aspect Ratio: | 75 |
Dosage: | 15kgs/m3 | Tensile Strength: | 1145Mpa |
Standard: | ASTM A920 | ||
High Light: | high tensile strength concrete steel fiber,hooked loose type concrete steel fiber,concrete steel fiber astm a920 |
High Tensile Strength Fiber Hooked Concrete Loose Type Concrete Steel Fiber
Steel Fiber Introduction
We supply Steel Fibers made from prime quality hard-drawn steel wire to ensure high tensile strength.The wire is deformed with hooked ends and cut to lengths, used in reinforcement concrete, mortar and other composite materials. Due to this high strength,the uniform distribution of fibers, stresses can be fully dispersed and cracking be effectively controlled.
Concrete Steel fibrehas also been employed as slabs, bridge decks, airport pavements, parking areas, and cavitation/erosion environments, as well as worldwide for the production of highway slabs. Steel fibre high-strength
concrete (SFHSC) is an option for the design of critical regions in earthquake-resistant structures exposed to impact and flatigue
Specifications:
Steel Fiber |
Model | Diameter (mm) | Length (mm) | Aspect ratio (mm) | Tensile strength (MPa) | ||||
YS-60/60 | 1 | 60 | 60 | ≥1000 | |||||
YS-50/50 | 1 | 50 | 50 | ≥1000 | |||||
YS-65/60 | 0.9 | 60 | 65 | ≥1000 | |||||
YS-55/50 | 0.9 | 50 | 55 | ≥1000 | |||||
YS-80/60 | 0.75 | 60 | 80 | ≥1000 | |||||
YS-45/35 | 0.75 | 35 | 45 | ≥1000 | |||||
YS-50/30 | 0.6 | 30 | 50 | ≥1100 | |||||
YS-55/30 | 0.55 | 30 | 55 | ≥1100 | |||||
YS-65/35 | 0.53 | 35 | 65 | ≥1100 | |||||
YS-60/30 | 0.5 | 30 | 60 | ≥1100 | |||||
YS-50/25 | 0.5 | 25 | 50 | ≥1100 | |||||
YS-60/25 | 0.4 | 25 | 60 | ≥1100 |
How and When the Fiber is Added
Typically the fibers are added at the batch plant, just after all concrete aggregates are being mixed. Some people would request to have the fiber added at the job site, but then the QA/QC should have more control on how much fiber
is added. The steel fiber manufacturer can provide guidance on how to mix and the amount needed to obtain the desired results. Be aware that if you add too much fiber, it might show up at the surface when finishing the concrete
so be cautious about the amounts being mixed
FAQ:
1. Are you the factory?
Yes, we are, located in the hometown of wire mesh.
2. How far from Beijing airport?
It takes three hours from our factory to Peking airport,about 300km.
3. Can you accept OEM?
Yes, we can.
4. What is your delivery time?
Generally it needs 10days for 20’ container.
Package and Delivery
Contact Person: Wang Huifang
Tel: +86 15933817644
Fax: 86-318-7886888