Product Details:
|
Product Name: | Factory Steel Wire Fiber Hooked Ends Loose Steel Fiber For Fiber Concrete | Type: | Copper Coated, Glued, Loose |
---|---|---|---|
TS: | >1180Mpa | Packing: | 1000kgs/bag |
Applicant: | Dam | Color: | Bright |
High Light: | Copper Coated Hooked Ends Steel Fiber,OEM Hooked Ends Steel Fiber,ISO Hooked Steel Fibre |
Factory Steel Wire Fiber Hooked Ends Loose Steel Fiber For Fiber concrete
Hooked Ends Loose Steel Fiber introduction
Hooked end steel fiber is manufactured by high quality wire rod with 6.5mm, this cold drawn steel wire has excellent mechanical properties including high tensile strength. Hence, the average tensile strength of the reinforced fibre surpasses 1000MPa,1200Mpa,1300Mpa,1500Mpa and even can reach 1800Mpa. Due to this high strength,the uniform distribution of fibers, stresses can be fully dispersed and cracking be effectively controlled.
Specification of Hooked Ends Loose Steel Fiber
Loose Steel Fiber |
Model | Diameter (mm) | Length (mm) | Aspect ratio (mm) | Tensile strength (MPa) | ||||
YS-50/50 | 1 | 50 | 50 | ≥1000 | |||||
YS-55/50 | 0.9 | 50 | 55 | ≥1000 | |||||
YS-45/35 | 0.75 | 35 | 45 | ≥1000 | |||||
YS-50/30 | 0.6 | 30 | 50 | ≥1100 | |||||
YS-55/30 | 0.55 | 30 | 55 | ≥1100 | |||||
YS-65/35 | 0.53 | 35 | 65 | ≥1100 | |||||
YS-60/30 | 0.5 | 30 | 60 | ≥1100 | |||||
YS-50/25 | 0.5 | 25 | 50 | ≥1100 | |||||
YS-60/25 | 0.4 | 25 | 60 | ≥1100 |
Mixing proportion of Hooked Ends Steel Fiber
Areas of application | LBS/Y3 | (KG/M3) |
Industrial Ground Floor Slabs | 20-120 | 12-72 |
Airport(aprons, taxiways and runways) | 20-160 | 12-95 |
Cemetery | 25 | 15 |
Road | 20-25 | 12-15 |
FQA
1. Are you factory/ manufacturer of trader?
We are factory in Anping with 24000㎡. So it will help you save money and time in delivery.
2. How long for the transit time?
To South-East Asia,generally 5-20days on sea,Europe takes 30-40day,
US needs10-15day,while South America 30-50days.
3. How is the package?
Small bag, bulk bag,carton avaiable.
4.How far from Beijing airport?
It takes three hours from our factory to Peking airport,about 300km.
5. Can you accept OEM?
Yes, we can.
6. Which port do you always choose?
Tianjin port,Beijing airport,Qingdao port,Shanghai port.
Project
Package and Delivery
Fair and Us
Contact Person: Wang Huifang
Tel: +86 15933817644
Fax: 86-318-7886888